New Toronto Data Center

Get the best in flexibility and performance in Canada’s high tech capital.

Check out our newest data center—TOR1—offering 66,000 square meters with a critical power capacity of up to 46 megawatts.

1 Century Place, Vaughan, ON L4L 8R2

Consisting of 23 computer rooms ranging from 800 to 1,200 square metres (8,600 to 13,000 square feet), TOR1 can accommodate power capacities between 1.0 and 3.0 megawatts per room. Resiliencies range from N to 2N with a power density range of 1,076 to 3,228 watts per square metre (100 to 300 watts per square foot). TOR1’s proximity to downtown, major highways and an international airport makes it easy to access. Other features include:

  • Flexibility: carrier-neutral
  • Diverse fibre paths directly to your computer room
  • Diverse pathways to major carrier hotel at 151 Front Street West Up to 46 MW of critical load capacity
  • Customizable & flexible power in every computer room
  • Flexible power densities to meet your needs UPS and generators for uninterrupted operations
  • Engineered to deliver a PUE of 1.25 annualized at full capacity

Get an Inside Look

Download Brochure

Contact Us